NuGreen Solutions are pleased to announce securing the John Deere Distribution Centre LED upgrade in Melbourne. The prestigious DC will see multifunctional LED high bays with aisle specific integrated sensor technology being installed, and look forward to operational savings close to 85% once complete. NuGreen were selected following a rigorous trial where measured savings, operational performance and reliability (on site warranty) were seen as the point of difference for John Deere. Learn more on this upgrade and how your Industrial Facility can become efficient www.nugreen.com.au