Impact Investment Group and the TAC requested a design solution to add an additional 40kW of Solar to the existing 60kW on their iconic building in Geelong.

NuGreen’s design included DC optimised Solar Panels from Trina to minimise the impact of any shaded conditions. NuGreen’s cost efficient design was awarded the contract.

NuGreen completed the installation in February with the 153 Trina Smart Gen 2 Pro on the TAC Head Office in Geelong along with a new roof-top walkway and incorporated the entire 100kW Solar generator in to the one monitoring system.

Find out more nugreen.com.au